West Broad Avenue Sidewalk Closed for Construction

ALBANY, Ga. – Construction is underway at the Davis Exchange building located at 102 N. Washington Street. To assist with the work, Sheridan Construction will be installing an external trash chute and dumpster on the eastern corner of the building on W. Broad Avenue, which will block a portion of the sidewalk.

Sheridan Construction will implement the following safety protocols while construction is underway.

• Rerouting of pedestrian traffic utilizing barricades and fencing that meet or exceed
applicable safety and ADA guidelines.

• Clear and visible safety signage to warn and direct the public around the construction
zone.

• Secure perimeter fencing to restrict unauthorized entry into active work areas.

• Daily inspections by our site-safety personnel to ensure continued compliance with OSHA
standards, City ordinances, and Sheridan Construction’s internal safety protocols.

• Immediate corrective action procedures should any condition arise, that may compromise
public safety or impede pedestrian flow.

While this chute and dumpster are temporary, they will be in place for the duration of the construction and renovation of the Davis Exchange Building.

See the map below for a layout of the placement of the chute and dumpster

Copyright 2025 South Georgia News. All rights reserved.