East side of 4th Ave. at Jefferson St. intersection closure due to Combined Sewer Separation project

ALBANY, Ga. – On Friday, December 8, 2023, at 6 a.m., the east side of 4th Avenue at the Jefferson Street intersection will be closed for the ongoing Combined Sewer Separation (CSS) project.

During this period, the public can access the Emergency Room via Washington and Jackson Streets, proceeding along 5th Avenue to Jefferson Street, as 4th Avenue will be closed to through traffic.

Emergency Room traffic will follow the detour turn south from 5th Avenue onto Jefferson Street, then make a right onto 4th Avenue to reach the Emergency Room at Phoebe Putney Memorial Hospital.

Upon exiting the Emergency Room, drivers should follow the detour signs through the parking lot across from Phoebe, using the temporary cut-through to the 4th Avenue Alley, turning right to Jefferson Street, and then left back to 5th Avenue. Turning options at 5th Avenue are left to Monroe Street or right to Jackson Street.

All intersections between 7th Avenue and W. Society Avenue will remain open for crossover traffic on Jefferson Street.

In the affected area, Blue Emergency Room signs and detour signs will guide drivers to the Emergency Room or navigate around the construction site. Motorists are urged to remain vigilant for changing traffic conditions.

For more information on the CSS project, please visit http://www.albanyga.gov/css.

Please see the attached map below. Green arrows represent access to the hospital and red arrows are for leaving the hospital.

12 5 23 Press Release Jefferson And 4th Closure 1

(City of Albany)

12 5 23 Press Release Jefferson And 4th Closure 2

(City of Albany)

Copyright 2023 CBS 44 South Georgia. All rights reserved.